Carpenter laying panels on the roof beams of a timber house, two colleagues working behind him.
Services

What we build.

Finished timber house with a light facade and a covered wooden deck among pine trees.

Complete timber houses

From the foundation to the roof. Turnkey, with materials that carry a name and a warranty.

Wooden deck with a pergola and garden furniture in front of a blue timber house.

Terraces & decks

Covered outdoor spaces and decks that fit the house and the landscape.

Open living space with dark ceiling beams, a kitchen and a wooden counter.

Interior finishing

Floors, walls and ceilings, finished cleanly down to the last detail.

Ramiro and a team member go over a plan together in the wood-lined office. © Stefan Veit

Planning & consultation

We plan with you before building starts: floor plan, budget and process.

How the build works

Seven steps. No surprises.

Foundation of concrete piers on the sandy plot, surrounded by pines. Timber floor frame on the piers, the first wall already standing behind it. The house with its walls closed in panels, windows and doors not fitted yet. Three builders work on the scaffold and on the roof. Two builders lay the battens for the floor inside. Finished living space with an open kitchen, timber beams and a mezzanine. Finished timber house with a deck and a pergola among pines.
1

Consultation

1 to 2 weeks

We listen: your land, what you want, your budget.

You decide Whether to move forward.

2

Design

2 to 4 weeks

We draw the floor plan and elevations.

You decide Room layout and orientation.

3

Quote & contract

about 1 week

We work with a contract. Price and scope are set in writing.

You decide Scope and finishes.

4

Plans & permits

runs in parallel

All plans go to the authorities; the permit takes about 1 month. In parallel we order the materials.

You decide Nothing more · we take it from here.

5

Construction

15–20 m² / month

We build on site, on vibrated-concrete piers, at least 50 cm above ground.

You decide Access to the site and the decoration.

6

Handover

on completion

Finished house, inspected and handed over cleanly.

You decide The move-in date.

7

Warranty

10 years

Warranty in writing. We stay reachable.

You decide Nothing · we stand behind it.

15–20 m²
built per month
3–4 months
for a small house
Prices with no fine print

Others hand over a shell. With us, you move into a finished house.

One price per m². You know what's in it.

Included
  • Material
  • Labor
  • Social security (BPS)
  • Taxes
  • Kitchen
  • Bathroom
  • Interior electrics
  • Wastewater system to code
  • Handling your permit
Not included
  • Appliances
  • Decoration
  • Building permit fee
  • UTE power meter and cable up to the distribution board
  • Water connection

Access road, well, solar: we connect you with local providers.

See extra services
Don't have land yet?

We know the local agency.

Through us you get in touch with them directly. We help you with the land search. That way you search with people who know the area.

How to find your land
Grassy dunes by the sea, with the Punta del Este skyline on the horizon. © Stefan Veit
Building from abroad

You plan from home. We build in Uruguay.

Ramiro or Carlos stop by the site morning, noon and afternoon, and every site has its own foreman. Every Friday, photos show you how far your house has come.

Building from abroad

Tell us about your land.

It all starts with step one, the consultation: your land, what you want, your budget. Then you decide whether to move forward.