ILKA from outside: yellow timber house with a pergola over the deck, pines in the background.
Finished house

ILKA

Yellow facade, built and handed over in four months.

The brief

ILKA stands in Barrio Anaconda. Yellow facade, 60 m², built and handed over in four months.

From structure to handover

Three build phases
01

Shell & structure

From the floor to the roof frame · the construction, before it disappears.

02

Under construction

Tidy on site · every step documented.

03

Finished & handover

The result · inside and out.

ILKA

Key facts
Location
Barrio Anaconda
Area
60 m²
Year built
2026
Build time
4 months
Materials
Rothoblaas Moisture barrier
Isover Insulation
Built with Rothoblaas and Isover · see the whole material story. Materials & Quality

How does your project start?

You just saw how a house comes together, phase by phase, through to handover. Tell us about your land · we'll look at it together.